When do I need to call for inspections after my permit has been issued?
The required inspections are listed on your copy of the permit. All work must be inspected before it is covered up. For example, we must inspect the footing/foundation after it is excavated; installation of steel reinforcement and before concrete is poured. A minimum of 24-hours notice is required prior to each inspection. Inspections can be requested by calling (707) 522-8346.